Lesson 2, Concept 5

NTS Standard Net Procedures


The procedures described in this Concept are recommended as NTS standards. Deviations from these procedures are made at the discretion of the net manager in cognizance of either necessity or desirability arising out of extraordinary circumstances, but always as a temporary expedient until standard procedure can be resumed. The following procedures apply to all NTS nets:


View the Lesson Material.

 

MENUICON.GIF (1183 bytes) STARTICX.GIF (1174 bytes) NEXTICON.GIF (1232 bytes) PREVICOX.GIF (1212 bytes) RECAPICN.GIF (1198 bytes) TESTICON.GIF (1223 bytes)